2017 December 10: Assembly (3.50 hours)
Updated: 
- Installed transmission shift linkage with ball joint rod ends.
 - Installed proper length bolts for handlebar risers and fully tightened.
 - Shortened a stainless steel bolt to 75 mm for the lower starter mount and installed.
 - Set valve clearance.
 - Installed intake manifolds.
 - Test fit header pipe nuts. Left one is a bit loose and will need to be enlarged to fit properly.
 - Removed the old paint from the outside of the original breather. Inside is soaking for more cleaning.