2017 December 10: Assembly (3.50 hours)

Updated: 

  • Installed transmission shift linkage with ball joint rod ends.
  • Installed proper length bolts for handlebar risers and fully tightened.
  • Shortened a stainless steel bolt to 75 mm for the lower starter mount and installed.
  • Set valve clearance.
  • Installed intake manifolds.
  • Test fit header pipe nuts. Left one is a bit loose and will need to be enlarged to fit properly.
  • Removed the old paint from the outside of the original breather. Inside is soaking for more cleaning.