Technical informationProject motorcyclesRoy Smith's Moto Guzzi 850 T3 engine rebuild2013 March 19: Install the oil pressure sending unitCreated: 2013 March 19Updated: 2013 March 19FirstPreviousNextLastI refit Roy's original oil pressure sending unit.Photo courtesy of Gregory Bender.Direct link to imageHere it is fully tightened.Photo courtesy of Gregory Bender.Direct link to imageFirstPreviousNextLastAdditional entries for this project2013 March 19: Inspect and prepare the crankcase2013 March 19: Ensure the bottom of the crankcase and sump are flat2013 March 19: Prepare the crankshaft2013 March 19: Prepare the rear main bearing2013 March 19: Install the breather pipes in the bellhousing2013 March 19: Install the camshaft2013 March 19: Install the oil pump2013 March 19: Install the front main bearing2013 March 19: Install the crankshaft2013 March 19: Install the rear main bearing2013 March 19: Install the timing sprockets, chain, and tensioner2013 March 19: Fit the timing chest cover2013 March 19: Revisit the rear main bearing2013 March 19: Fit the connecting rods2013 March 19: Fit the oil sump and sump extension2013 March 19: Install the flywheel and clutch2013 March 19: Install the alternator and rotor2013 March 19: Install the oil pressure sending unit2013 March 19: Install the tappets2013 March 19: Install the right piston and cylinder2013 March 19: Install the left piston and cylinder2013 March 19: Install the left cylinder head2013 March 19: Install the right cylinder head2013 March 19: Install the distributor2013 March 19: Repair timing chest cover