2006 August 10: Generator (2.00 hours)

Updated: 

Disassembled and cleaned the generator. Still need to remove the field coils so I can send the steel body out to be plated.

Placed order for 2 new bearings.

Placed order for a set of drag links so I might remove the large screws that secure the field coils.

Placed order for 3M #27 glass tape so that I can reinsulate the field coils once I've removed them.